RefSheet ST-101DissNGL4 Reference description
Client HYUNDAI Eng. & Constr. Co. Owner QGPC Location NGL-4 Qatar Scope of work Package Supply Year of completion 2001 Status Delivered KEY STAFF Project Director M. Rognoni Project Manager P. Lucchi Process Manager A. Trezzi Chief Designer P. Lucchi Quality Controller A. Trezzi PROCESS Water to be treated Sea water Total Design Capacity 100 t/d Number of units 2x50% Guaranteed TDS 5 ppm Process Arrangement Serpentine Evaporative effect Tubes material Titanium / Hastelloy Shell material CuNi 90-10/Duplex Steel Tubes fixing Welded Top Brine Temperature 61°/102° C Notes: One unit is equipped with air condenser. Fully skidded prewired units. Project subject to HAZOP chaired by SNAMPROGETTI. Download files connected with the Project